AI-generated Key Takeaways
-
Campaigns can have their duration defined either by a specific date range or by a number of days.
-
The
date_range
field requires dates in yyyy-mm-dd format, must be inclusive, the end date must be less than one year in the future, and the range must be 92 days or less. -
The
duration_in_days
field accepts an integer value representing the campaign's duration in days. -
The
date_range
andduration_in_days
fields are mutually exclusive and cannot be used together.
The duration of a planned campaign.
Fields | |
---|---|
|
Date range of the campaign. Dates are in the yyyy-mm-dd format and inclusive. The end date must be < 1 year in the future and the date range must be <= 92 days long. This field cannot be combined with the duration_in_days field. |
|
The duration value in days. This field cannot be combined with the date_range field. |